Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?
The heat load (BTU (calories/hour) of all equipment installed within the space
Location of the telecommunications own dedicated electrical distribution panel
The quantity and size of HVAC vents needed for the room
Location and size of condensate drain
Submit