Total float = Late Finish (LF) - Early Finish (EF) or Late Start (LS) - Early Start (ES).
Activity C (Draft Product Manual) lies on the critical path, so its float is 0.
Verification with PSP Guidelines:The PSP Study Guide defines total float as the amount of time an activity can be delayed without delaying the project (Ref: PSP Study Guide, Chapter 2A: Float Analysis).