Questions # 51:

Which of the following about typical information found within a test plan is FALSE?

Options:

A.

The need to temporarily have additional test personnel available for specific test phases and/or test activities


B.

The conditions that must be met in order for the test execution activities to be considered completed.


C.

The list of the product risks which have not been fully mitigated at the end of test execution.


D.

The conditions that must be met for part of all the planned activities to be suspended and resumed.


Expert Solution
Questions # 52:

Which of the following answers describes a reason for adopting experience-based testing techniques?

Options:

A.

Experience-based test techniques provide more systematic coverage cnteria than black-box and white-box test techniques


B.

Experience-based test techniques completely rely on the tester's past experience for designing test cases.


C.

Experience-based test techniques allow designing test cases that are usually easier to reproduce than those designed with black-box and white-box test techniques.


D.

Experience-based test techniques tend to find defects that may be difficult to find with black-box and white-box test techniques and are often useful to complement these more systematic techniques.


Expert Solution
Questions # 53:

Which one of the following is a typical entry criteria for testing?

Options:

A.

Planned tests have been executed.


B.

Availability of testable requirements.


C.

The number of unresolved defects is within an agreed limit.


D.

The number of estimated remaining defects is sufficiently low.


Expert Solution
Questions # 54:

Atypical generic skill required for the role of tester is the ability to

Options:

A.

Take on the role of developer to meet challenging project deadlines


B.

Assume leadership aimed at imposing decisions on the rest of the team.


C.

Use tools to make the execution of repetitive testing tasks more efficient.


D.

Determine the corrective actions to get a test project on track in case of deviations from the test plan


Expert Solution
Questions # 55:

During which main group of test activity are the following tasks performed?

•Checking test results and logs against specified coverage criteria.

•Assessing the level of component or system quality based on test results and logs.

•Determining whether more tests are needed.

Select the correct answer:

Options:

A.

Test planning.


B.

Test analysis.


C.

Test design.


D.

Test monitoring and control.


Expert Solution
Questions # 56:

For each test case to be executed, the following table specifies its dependencies and the required configuration of the test environment for running such test case:

Question # 56

Assume that C0NF1 is the initial configuration of the test environment Based on this assumption, which of the following is a test execution schedule that is compatible with the specified dependencies and allows minimising the number of switches between the different configurations of the test environment^

Options:

A.

TC4, TC3, TC2, TC1, TC5.


B.

TCI, TC5, TC4, TC3, TC2


C.

TC4, TC3, TC2, TC5, TC1.


D.

TC4, TC1, TC5, TC2, TC3


Expert Solution