Questions # 1:

Who of the following has the best knowledge to decide what tests in a test project should be automated?

Options:

A.

The developer


B.

The customer


C.

The development manager


D.

The test leader


Expert Solution
Questions # 2:

Consider a given test plan which, among others, contains the following three sections: "Test Scope", "Testing Communication", and "Stakeholders". The features of the test object to be tested and those excluded from the testing represent information that is:

Options:

A.

not usually included in a test plan, and therefore in the given test plan it should not be specified neither within the three sections mentioned, nor within the others


B.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Test Scope" rather than in the other two sections mentioned


C.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Testing Communication" rather than in the other two sections mentioned


D.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Stakeholders" rather than in the other two sections mentioned


Expert Solution
Questions # 3:

A program is used to control a manufacturing line (turn machines on and off. start and stop conveyer belts, add raw materials to the flow. etc.). Not all actions are possible at all times. For example, there are certain manufacturing stages that cannot be stopped - unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action is not allowed) are covered by the tests.

Which coverage metric will provide the needed information for this analysis?

Options:

A.

Code coverage


B.

Data flow coverage


C.

Statement coverage


D.

Branch Coverage


Expert Solution
Questions # 4:

For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases

Question # 4

Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?

Options:

A.

TC4, TC3, TC2, TC6, TC5. TC1


B.

TC4, TC6, TC3, TC2, TC5, TC1


C.

TC3, TC5, TC6, TC1, TC4, TC3


D.

TC4, TC3, TC2, TC6, TC1, TC5


Expert Solution
Questions # 5:

Which of the following statements is TRUE?

Options:

A.

User acceptance tests are usually automated and aim to verify the acceptance criteria for user stories


B.

Acceptance criteria for user stories can include details on data definitions, for example by describing the format, allowed values, and default values for a data item


C.

Acceptance criteria for user stones should focus on positive scenarios, while negative scenarios should be excluded


D.

Tests derived from acceptance criteria for user stories are not included in any of the four testing quadrants


Expert Solution
Questions # 6:

Which ONE of the following elements is TYPICALLY used to guide testing duringexploratory testing?

Options:

A.

A test charter that defines the testing objectives for the test session.


B.

A comprehensive specification that must be fully available before testing begins.


C.

A detailed test script that prescribes all the steps to be performed.


D.

A predefined test case that must be executed exactly as documented.


Expert Solution
Questions # 7:

Which one of the following statements IS NOT a valid objective of testing?

Options:

A.

To build confidence in the level of quality of the test object.


B.

To find all defects in a product, ensuring the product is defect free.


C.

To find failures and defects


D.

To evaluate work products such as requirements, user stories, design, and code.


Expert Solution
Questions # 8:

As a tester, as part of a V-model project, you are currently executing some tests aimed at verifying if a mobile app asks the user to grant the proper access permissions during the installation process and after the installation process. The requirements specification states that in both cases the app shall ask the user to grant access permissions only to the camera and photos stored on the device. However, you observe that the app also asks the user to grant access permission to all contacts on the device. Consider the following items:

[I]. Test environment

[ii]. Expected result

[iii]. Actual result.

[IV] Test level.

[V]. Root cause.

Based on only the given information, which of the items listed above, are you able to CORRECTLY specify in a defect report?

Options:

A.

[l] and [IV]


B.

[ii] and [III].


C.

[ii], [iii] and [v]


D.

[ii], [IV] and [V].


Expert Solution
Questions # 9:

Which TWO of the following are benefits of continuous integration?

I. Allows earlier detection and easier root cause analysis of integration problems and conflicting changes.

II. Removes the need for manual test analysis, design and execution.

Hi. Removes the dependency on automated regression packs when integrating larger systems, or components.

iv. Gives the development team regular feedback on whether the code is working.

Select the correct answer:

Options:

A.

i and iv


B.

i and ii


C.

i and iii


D.

iii and iv


Expert Solution
Questions # 10:

Which of the following statements is not correct?

Options:

A.

Looking for defects in a system may require Ignoring system details


B.

Identifying defects may be perceived as criticism against product


C.

Looking for defects in system requires professional pessimism and curiosity


D.

Testing is often seen as a destructive activity instead of constructive activity


Expert Solution