Questions # 21:

Which of the following can be considered pre-consumer recycled content?

Options:

A.

Aluminum cans used to make sheet metal


B.

Plastic bottles that are used to create upholstery fabric


C.

Sawdust from a lumber mill used to make composite board


D.

Glass manufacturing scraps (culls) that are used to create new glass


Expert Solution
Questions # 22:

For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the

Options:

A.

Corrective Action Plan


B.

Thermal Comfort Survey


C.

functional performance tests


D.

mechanical drawings showing all equipment installed


Expert Solution
Questions # 23:

In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?

Options:

A.

Develop and implement a commissioning plan


B.

Review the contractor's submittals for compliance with design documents


C.

Verify the installation and performance of the systems being commissioned


D.

Review the owner's requirements and the basis of design for clarity and completeness


Expert Solution
Questions # 24:

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

Options:

A.

Indoor Environmental Quality Credit, Acoustic Performance


B.

Energy and Atmosphere Credit, Advanced Energy Metering


C.

Energy and Atmosphere Credit, Optimize Energy Performance


D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies


Expert Solution
Questions # 25:

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures


B.

Include only the existing fixtures and exclude the newly installed fixtures


C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit


D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures


Expert Solution
Questions # 26:

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

Options:

A.

Choosing energy efficient systems


B.

Conducting a simple box energy model


C.

Implementing passive design strategies


D.

Performing commissioning of energy systems


Expert Solution
Questions # 27:

Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

Options:

A.

Discovery; design and construction; occupancy; operations and feedback


B.

Discovery and design; construction and occupancy; post occupancy and operations


C.

Pre-design and design; construction and occupancy; post occupancy and operations


D.

Pre-design and design; construction and pre-occupancy; post occupancy and operations


Expert Solution
Questions # 28:

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

Options:

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier


B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier


C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier


D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier


Expert Solution
Questions # 29:

The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?

Options:

A.

Increase the rainwater infiltration capacity


B.

Decrease the amount of bicycle parking that must be provided


C.

Increase the overall SR (solar reflectance) of the hardscape area


D.

Decrease the required amount of on-street parking that must be provided


Expert Solution
Questions # 30:

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal


B.

Manufacturer Inventory


C.

GreenScreen v1.2 Benchmark


D.

Chemical Abstract Service Registration Number (CASRN)