Questions # 11:

Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?

Options:

A.

Location and Transportation Credit, Bicycle Facilities;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance


B.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Quality Views


C.

Location and Transportation Credit, Bicycle Facilities;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance;

Indoor Environmental Quality Credit, Quality Views


D.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Interior Lighting


Expert Solution
Questions # 12:

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.

10%


B.

15%


C.

20%


D.

25%


Expert Solution
Questions # 13:

Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?

Question # 13

Options:

A.

View Factor 1


B.

View Factor 2


C.

View Factor 4


D.

View Factor 5


Expert Solution
Questions # 14:

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction


B.

Providing calculations of only the plug load reduction


C.

Providing explanations of at least two plug load reduction strategies


D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies


Expert Solution
Questions # 15:

A project team is implementing a strategy that controls the admission of natural light into the office space being developed. To which credit can this contribute?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting


B.

Indoor Environmental Quality Credit, Thermal Comfort


C.

Energy and Atmosphere Credit, Advanced Energy Metering


D.

Energy and Atmosphere Credit, Optimize Energy Performance


Expert Solution
Questions # 16:

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

Options:

A.

Included in the numerator only


B.

Included in the denominator only


C.

Included in both the numerator and denominator


D.

Excluded from both the numerator and denominator


Expert Solution
Questions # 17:

When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?

Options:

A.

Location


B.

Climate zone


C.

ENERGY STAR® score


D.

Heating and cooling degree days


Expert Solution
Questions # 18:

Which standard reference can be used to find minimum ventilation rates?

Options:

A.

ASHRAE 55-2010


B.

ASHRAE 90.1-2010


C.

SCAQMD Rule 1168


D.

ASHRAE 62.1-2010


Expert Solution
Questions # 19:

A mechanical engineer needs to determine the number of carbon dioxide monitors needed for the public area of a hotel. The public area includes the hotel front desk, the hotel lobby, two public restrooms and one corridor.

The aim is to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Additional Enhanced IAQ Strategies, Part C. Carbon Dioxide Monitoring. The project's LEED AP

should recommend a minimum of how many CO2 monitors?

Options:

A.

One


B.

Two


C.

Four


D.

Five


Expert Solution
Questions # 20:

Source reduction appears at the top of the Environmental Protection Agency's (EPA's) hierarchy because it

Options:

A.

reduces environmental impacts by reusing existing materials


B.

reduces environmental impacts associated with material containing high levels of toxic chemicals


C.

reduces environmental impacts throughout the material's life cycle by specifying recycled content in the material selected


D.

reduces environmental impacts throughout the material's life cycle, from the supply chain and use to recycling and waste disposal


Expert Solution