A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?
A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.
Which option should be used to resolve this issue?
Which two components must be identified to validate that software compatibility requirements are met for Nutanix Cluster Installation? (Choose two.)
A consultant is viewing an ESXi host via console without external network connectivity.
Which two IP addresses can be used to connect to the CVM (Choose two.)
A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.
Which action should the consultant take to resolve this issue?
A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.
Which ESXi HA/DRS cluster setting is missing?
A consultant is running the Foundation VM using desktop virtualization software. No nodes are discovered.
What should the consultant verify first?
A consultant is imaging a Nutanix cluster with VMware ESXi. Foundation returns an error that the media is not a supported ISO. The consultant checks the whitelist file in Foundation and confirms that the version of the ISO is not listed.
Which three actions should the consultant take to resolve this issue? (Choose three.)
A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.
How should the consultant resolve this issue?
To prepare for a new Nutanix installation, a consultant downloads the Foundation VM, imports the VM to their Desktop Virtualization Solution, and powers on the VM. The IPv4 static address on the host workstation and the Foundation VM have been configured, but pings between them fail.
Which two troubleshooting steps should the consultant perform? (Choose two.)