Pass the Nutanix Nutanix Certified Advanced Professional (NCAP) NCM-MCI-5.15 Questions and answers with CertsForce

Viewing page 1 out of 4 pages
Viewing questions 1-10 out of questions
Questions # 1:

An organizations Nutanix Cluster is based on VMware vSphere. The cluster is configured to download software updates automatically. The administration needs to verify and eventually upgrade VMware hypervisor via Prism Ul.

After logging in to Prism, the administrator receives the message shown:

No available versions for upgrade

What is causing the current state?

Options:

A.

VMware support has expired, so downloads are not available.


B.

vSphere binaries need to be manually uploaded.


C.

The environment is running the latest vSphere version, so no update is required.


D.

The cluster is unable to connect to reIease-api.nutanix-ccm:8D.


Questions # 2:

Refer to the exhibit.

Question # 2

An administrator has an existing cluster and needs to improve performance using AHV Turbo. Which two items are required to achieve even greater performance? (Choose two.)

Options:

A.

Workloads are multi-threaded.


B.

VMs have one vCPU configured.


C.

VMs have multi-queue disabled.


D.

VMs have more than one vCPU.


Questions # 3:

An administrator configures authentication in Prism Central (PC) for the NTNX-Admins group. Users report that they are unable to log in. The administrator confirms that the Active Directory (AD) settings in PC are correct.

Which condition could result in this behavior?

Options:

A.

A role mapping needs to be associated with the AD group.


B.

The users must be added to the Domain Admins AD group.


C.

The Local authentication type must also be selected in PC.


D.

A client chap certificate must also be added in PC.


Questions # 4:

An administrator has an existing Nutanix seven-node cluster running at RF2 that must be changed to have the following capabilities:

• RF3 set for the cluster

• Performance tier deduplication

What is the minimum memory needed on the CVMs to allow for these capabilities?

Options:

A.

24GB


B.

28GB


C.

32GB


D.

20G?


Questions # 5:

Refer to the exhibit.

Question # 5

An administrator notices a critical alert on the Metro Availability Protection Domain What is causing this alert?

Options:

A.

Metro Availability Protection domain is active on the remote site.


B.

VMware Site Recovery Manager is handling a failover event


C.

Metro Availability did not fail over and caused an outage.


D.

vSphere moved VMs to the remote container, and the VMs must be moved back.


Questions # 6:

Refer to the exhibit. Question # 6

An administrator logged into Prism Element, notices the following in the home dashboard, and showing the exhibit.

Which action should the administrator take next?

Options:

A.

Configure the fqdn for the hosts indicated


B.

Troubleshoot the zookeeper server issue


C.

Re-run NCC specifying data_resiliency_check


D.

Check the hardware page for disk failures


Questions # 7:

An administrator deploys Exchange on a Nutanix cluster. The administrator creates two containers with RF2 configuration:

• One container for Exchange

• One container for the other VMs

The Exchange VM is experiencing I/O performance issues.

Which changes to Storage Optimization should be used on the Exchange container to enhance I/O performance?

Options:

A.

No data reduction


B.

Post process Deduplication only


C.

Inline compression and EC-X


D.

Inline compression and Deduplication


Questions # 8:

An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs.

What are two impacts on the cluster? (Choose two.)

Options:

A.

Increase CPU utilization%


B.

Increase CPU ready%


C.

Increase memory utilization%


D.

Increasing CPU counts will decrease memory utilization


Questions # 9:

An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.

The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.

Using Prism Central, which steps are required to identify the correct VMs to be deleted?

Options:

A.

Use Capacity Runway to filter by Test and Powered-off VMs


B.

Filter VMs list, choose Test category and Inactive under Efficiency


C.

Create a new Scenario selecting Test VMs. filter by uptime


D.

Create a new Project selecting Test VMs, sorting by power state


Questions # 10:

Refer to the exhibit.

Question # 10

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

Options:

A.

Remove the VMs. create a new Protection Domain, and add VMs to it


B.

Remove VMs from the Protection Domain and add them back in.


C.

Delete the Protection Domain, create a new Protection Domain, and add the VMs to it


D.

Create a new Protection Domain and add the VMs to rt.


Viewing page 1 out of 4 pages
Viewing questions 1-10 out of questions