Questions # 1:

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

Options:

A.

ISO 9126


B.

IEEE 829


C.

BS 7925/2


D.

DO-178B


Questions # 2:

Model characteristics:

Which THREE of the below mentioned characteristics relate to TMMi? 1 credit

Options:

A.

5 maturity levels


B.

Focussed on higher level testing


C.

20 key areas


D.

Highly related to CMMI


E.

Continuous model


F.

Staged model


G.

Focussed on component and integration testing


Questions # 3:

Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or TMMi? 2 credits

Options:

A.

If the scope of test performance improvement covers all test levels, TMMi is preferred since TPI focusses mainly on black-box testing.


B.

If the organization is already applying CMMI, TMMi may be preferred since it has the same structure and uses the same terminology. TMMi addresses management commitment very strongly and is therefore more suitable to support a top-down improvement process.


C.

TPI is much more a bottom-up model that is suitable for addressing test topics for a specific (test) project.


D.

TMMi can only be used with the traditional V model,whereas TPI can be used with all types of software life cycles.


Questions # 4:

A test assessment has been carried out using the selected model as a reference framework. A number of recommendations have been identified and you are asked to prioritize them. Based on your knowledge of the project, you are expecting severe resistance to change. Which of the following would be the most important selection criterion for defining the priority of the recommendations? 2 credits

Options:

A.

Synchronized with the overall long-term organizational strategy


B.

Defined according to the maturity model used


C.

Most visible to stakeholders


D.

Low costs actions first


Questions # 5:

Which of the following accurately defines the integration testing test level? [K2]

Options:

A.

Test basis includes software and system design, test objects include interfaces, and tests concentrate on the interactions between different parts of a system


B.

Test basis includes component requirements, test objects include database modules, and tests concentrate on the behaviour of the system as a whole.


C.

Test basis includes business processes, test objects include system configuration and configuration data, and tests concentrate on establishing confidence in the system


D.

Test basis includes use cases, test objects include user procedures and tests concentrate on a high level model of system behaviour


Questions # 6:

Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

Options:

A.

No priority or severity assigned


B.

Incident numbering is manual rather than automated


C.

No mentioning of reproduceability


D.

No classification on type of incident


Questions # 7:

Tests are prioritized so that:

Options:

A.

You shorten the time required for testing


B.

You do the best testing in the time available


C.

You do more effective testing


D.

You find more faults


Questions # 8:

Testing should be stopped when:

Options:

A.

All the planned tests have been run


B.

Time has run out


C.

All faults have been fixed correctly


D.

Both A and C


E.

It depends on the risks for the system being tested


Questions # 9:

Which of the following characteristics of good testing apply to any software development life cycle model?

Options:

A.

Acceptance testing is always the final test level to be applied.


B.

All test levels are planned and completed for each developed feature.


C.

Testers are involved as soon as the first piece of code can be executed.


D.

For every development activity there is a corresponding testing activity.


Questions # 10:

Which of the following are static techniques?

Options:

A.

Walkthrough.


B.

State transition testing.


C.

Decision table testing.


D.

Statement testing.