Weekend Sale Special Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: CFsave75

Pass the Huawei HCSA-Presales-Service H19-260_V2.0 Questions and answers with CertsForce

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

Which of the following is not a key activity for the SQA key role as a "continuous improvement pusher"? ( )

Options:

A.

Focus on the safety and quality results of product delivery and O & M, be target-oriented, and carry out safety and quality planning. Ensure that no safety accident and quality accident occur.


B.

Establish and implement the continuous improvement mechanism, instruct service personnel to apply scientific safety and quality engineering methods for analyzing problems and making improvement.


C.

Establish an incentive mechanism for continuous improvement, and regularly summarize and commend continuous improvement work.


D.

Regularly organize efforts to identify safety and quality improvement points and drive the continuous improvement of business.


Expert Solution
Questions # 12:

Which of the following features can increase the energy yield of PV system?

Options:

A.

Arc Fault Circuit Interrupter


B.

Smart string-level disconnection


C.

Module-level optimization


D.

Module-level shutdown


Expert Solution
Questions # 13:

Which of the following are included in the Data Center Facility Pre-sales Specialist Certification?

Options:

A.

Power


B.

Modular DC


C.

Cooling


D.

Expert Solution
Questions # 14:

Which of the following features can ensure energy storage safety?

Options:

A.

Active cutoff of battery pack optimizer


B.

Synergy of PV & ESS


C.

TOU


D.

Battery pack plug-and-play


Expert Solution
Questions # 15:

Which of the following techniques can detect and diagnose battery thermal runaway risks?

Options:

A.

Battery rack controller


B.

Battery pack optimizer


C.

String PCS


D.

Cloud BMS+intelligent internal short circuit detection


Expert Solution
Questions # 16:

Which of the following statements about the 2024 sales partner certification grace period management rules are correct?

Options:

A.

Grace period for new/upgraded certification: If the capability does not meet the requirements temporarily, the grace period cannot be applied for.


B.

Grace period for new/upgraded certifications: Meet the performance threshold requirements of the corresponding level in 2024, or the admission requirements of partners at the same level or higher in the industry.


C.

Review the capabilities on the second day after the grace period ends. If the certification threshold for 2024 is not reached, the employee will be downgraded.


D.

Expiration date of the grace period: not more than 6 months and not more than March 1 of the following year.


E.

Grace period for renewing the certification: The entry requirements for the performance threshold for the 2024 certification level must be met.


Expert Solution
Questions # 17:

One of the main purposes of building energy storage is to solve the problem of weak power grid under renewable energy high penetration scenario.

Options:

A.

True


B.

False


Expert Solution
Questions # 18:

Which of the following micro-grid scenarios requires a backup time of more than 6 hours?

Options:

A.

Industrial and commercial load micro-network


B.

New city micro-grid


C.

Civil load-like micro-grid


D.

Industrial load micro-grid


Expert Solution
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions