The exact extract asks which micro-grid scenario requires a backup time of more than 6 hours. The correct answer is B. New city micro-grid. A new city micro-grid is a large, high-continuity power-supply scenario, not a small backup-only C&I load scenario. It is closer to the Red Sea/New City type of architecture, where PV and ESS must support broad, continuous power demand and maintain stable power for a large community or city-level load. Huawei’s public Smart Micro-grid materials emphasize grid black-start, multiple operating modes, rapid on/off-grid switching, high/low-voltage ride-through, and reliable supply for critical loads. Huawei’s Red Sea New City project is described as a large PV+ESS microgrid intended to provide clean power at city scale. Compared with industrial or commercial backup scenarios, this type of new-city microgrid needs longer backup autonomy, so the “more than 6 hours” requirement aligns with option B. References: Huawei Smart Micro-grid and Red Sea New City materials.
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit