Black Friday Reward - Upto 80% off - Ends in 0d 00h 00m 00s - Coupon code: VIP80

Pass the HP ACMX HPE7-V01 Questions and answers with CertsForce

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

You presented a solution to your customer that will replace their legacy HPE BladeSystem.

The new solution is based on the HPE Synergy platform and consists of the following components:

    5 HPE Synergy 12000 frames

    2 HPE Virtual Connect SE 100Gb F32 Module for Synergy

    8 HPE Synergy 50Gb Interconnect Link Module

    60 HPE Synergy 480 Gen11

Which statement describes the business and financial benefits for this new solution on the customer?

Options:

A.

HPE Synergy supports master/satellite approach that requires less HPE Virtual Connect modules, and so will be more economical.


B.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more interconnect modules which provides better scalability and expansion possibilities.


C.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more expansion slots in the form of mezzanine cards.


D.

HPE Synergy needs more HPE Virtual Connect modules because of the increased bandwidth for Gen11 compute nodes.


Expert Solution
Questions # 12:

A customer wants a hardware platform to run a SAP HANA workload and is evaluating HPE Superdome Flex, HPE Synergy, and HPE ProLiant systems.

Which statement about these hardware platforms is true for a SAP HANA solution?

Options:

A.

HPE Superdome Flex can scale-up to 32 sockets and 48 TB of memory for SAP HANA and provides full support for HPE Persistent Memory.


B.

HPE Superdome Flex provides higher scalability, while HPE Synergy systems provide better reliability, availability, and serviceability features.


C.

HPE ProLiant DL560 Gen10 is delivered as a SAP HANA appliance, but it is also supported in the TDI model and fully supports HPE Persistent Memory.


D.

HPE Serviceguard for Linux licenses are attached to each HPE Superdome Flex chassis and provides lower cost for a HA solution for SAP HANA.


Expert Solution
Questions # 13:

Your customer is currently using an HPE SimpliVity 380 Gen10 solution and is planning for a generation refresh to an HPE SimpliVity 380 Gen11.

The existing cluster is planned to be maintained as a test and dev platform for another 24–36 months while production workloads are moved to the new environment.

The new solution will be purchased as HPE GreenLake for Private Cloud Business Edition, and the customer would like to include the existing Gen10 cluster within the same management platform.

Which statement is true about combining the management of both the old and new generations?

Options:

A.

The new PCBE platform can be downgraded for on-prem management for interoperability with the Gen10.


B.

The existing SimpliVity environment needs to be redeployed as PCBE to co-exist with the new solution.


C.

The new PCBE platform can manage the old platform by utilizing the Data Services Connector OVA.


D.

The existing SimpliVity environment can be imported into the HPE GreenLake platform using Data Services Connector.


Expert Solution
Questions # 14:

Your customer is considering HPE Alletra 6000 or HPE Alletra Storage MP B10000 for use as a Peer Persistence enabling platform for their critical workloads.

Which statement about these platforms and their benefits is true for Peer Persistence?

Options:

A.

With Alletra 6000 your customer will be able to combine an Active Peer Persistence environment with a one-to-many topology.


B.

With Alletra 6000 your customer will be able to use Active Peer Persistence to protect workloads running on VMware.


C.

With HPE Alletra Storage MP B10000 your customer will be able to combine an Active Peer Persistence environment with a one-to-many topology.


D.

With HPE Alletra Storage MP B10000 your customer will be able to use FC for underlying replication.


Expert Solution
Questions # 15:

Your customer is planning to buy a new hardware platform for their HPC application.

They are considering an environment with 150 HPE Cray XD2000 systems with XD225v and XD220v servers.

Your customer has the following requirements for a management platform:

    Supports Ubuntu Linux 24.04 operating system

    Supports bare metal server operating system provisioning

    Has the ability to install operating system in parallel on multiple nodes

    Management platform is highly available

You are exploring HPE Performance Cluster Manager (HPCM) as a solution.

What statement is true in this scenario?

Options:

A.

HPE Performance Cluster Manager will fit the customer’s requirements.


B.

One server node must be reserved for the Admin Node.


C.

A different management solution must be used for parallel OS installation.


D.

The Slingshot network component must be added to the solution.


Expert Solution
Questions # 16:

Your customer is planning to deploy several HPE ProLiant DL360 Gen11 servers with Windows Server 2025, for a bare-metal use case with no hypervisors.

The customer is concerned about the time it takes to scan and deploy the servers for new firmware and driver updates.

What HPE management tool can be used in this scenario to apply firmware updates to servers, with direct integration to HPE repositories?

Options:

A.

HPE OneView


B.

HPE Compute Ops Management


C.

HPE iLO Amplifier


D.

Microsoft Endpoint Configuration Manager


Expert Solution
Questions # 17:

Your customer has a networking environment based on Aruba CX 8325 switches configured with Quality of Service settings that give higher priority to iSCSI traffic between HPE ProLiant servers and HPE Alletra 6000 storage. They are planning to add HPE Synergy frames with HPE Virtual Connect modules that will connect to the same Aruba infrastructure.

The frames will be deployed in different VLANs. They need to update their environment to provide a lossless fabric for RoCE traffic that will traverse between the HPE Synergy frames and through multiple switches.

Your customer has two sets of Synergy frames in different logical enclosures connected with Aruba CX 8325 switches. They want to update their environment to provide lossless traffic for RoCE traffic.

What is the correct environmental or design change that will meet the customer’s new requirement?

Options:

A.

Use RoCEv1 and configure DCBX on the switch facing the CNA in the servers.


B.

Server Profiles should include redundant connections to a RoCE network.


C.

Create DCB queues using server’s operating system utility.


D.

Assign two different priority values to RoCE traffic.


Expert Solution
Questions # 18:

You have been assigned to design a solution for a customer that supports a virtualization workload based on HPE Synergy. The customer has the following requirements:

- Dual-socket HPE Synergy compute nodes running ESXi 8.x with the maximum supported memory

- Each node must have access to shared storage from HPE Alletra Storage MP B10000

- All virtual machines must be protected against host failure

- All virtual machines with 8 vCPUs must be provided with Fault Tolerance

- All compute nodes must boot from disks in the D3940 Storage Modules protected with RAID 1

- All frames must be managed as one logical enclosure to simplify management

- All compute nodes must support 2 network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that must be verified. The proposal includes:

- 3 HPE Synergy 12000 frames

- 2 HPE Synergy Composer modules

- 4 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- 4 HPE Synergy 50Gb Interconnect Link Modules

- 3 HPE Synergy D3940 Storage Modules, each with 20 SSD drives

- 1152-core vSphere Enterprise Plus subscriptions

- 36 HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

- A single Platinum 8562 CPU with 32 cores

- HPE Synergy 6820C 25/50Gb Converged Network Adapter

- HPE Synergy 5830C 32G Fibre Channel Host Bus Adapter

- HPE Microchip Smart RAID P416ie-m SR Gen10 12G SAS Mezzanine Controller

Which statement is true regarding the proposal?

Options:

A.

Six compute nodes should be removed as there is not enough space for 12 compute nodes and a D3940 Storage Module in a frame.


B.

OneView Advanced licenses should be added to the proposal as all of the compute nodes will be managed using HPE Composer.


C.

Six 12Gb SAS Connection Modules should be added to provide connectivity to the HPE Alletra MP B10000 storage array.


D.

Twelve 12Gb SAS Connection Modules should be added to provide connectivity to the D3940 Storage Modules.


Expert Solution
Questions # 19:

One of your customers is planning to refresh their current campus' wired and wireless networking equipment. They are currently moving to a pay-per-use model for their whole IT solution.

They are wondering if there is a possibility to get new networking equipment in this model without capital expenses. They are also interested in moving LAN management to an external service provider. You are presenting HPE GreenLake for Aruba Networking.

What is true regarding this scenario?

Options:

A.

Your customer can select a service level for onboarding, operating and updating Aruba networking.


B.

HPE GreenLake for Aruba Networking only offers a cloud management platform for customer-owned equipment.


C.

HPE GreenLake for Aruba Networking offers hardware installation services of customer-owned equipment.


D.

HPE GreenLake for Aruba Networking is the central monitoring cloud software for Aruba equipment only.


Expert Solution
Questions # 20:

You presented a solution to your customer that will replace their legacy HPE BladeSystem.

The new solution is based on the HPE Synergy platform and consists of the following components:

    5 HPE Synergy 12000 frames

    2 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    8 HPE Synergy 25/50Gb Interconnect Link Modules

    60 HPE Synergy 480 Gen11

Which statement about the business and financial benefit of the new solution for the customer is true?

Options:

A.

HPE Synergy 480 Gen11 compute modules have an extension that will allow the customer to install 4 GPUs in half-height format compute nodes.


B.

HPE Virtual Connect SE 100Gb F32 Module for Synergy can support FC traffic once an upgrade license for each module is added in HPE OneView.


C.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more expansion slots in the form of mezzanine cards.


D.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more interconnect modules, which provides better flexibility and expansion possibilities.


Expert Solution
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions