Pass the HP HPE ATP - Hybrid IT Solutions V2 HPE0-V14 Questions and answers with CertsForce

Viewing page 2 out of 9 pages
Viewing questions 11-20 out of questions
Questions # 11:

A customer needs to purchase a redundant pair of SAN switches for their virtualization environment. The customer requires a total of eight 16 Gbps FC storage ports and eighteen 8 Gbps FC host attachments.

Which switch meets the customer’s needs at the lowest cost?

Options:

A.

HPE StoreFabric SN6010C 48-port Switch


B.

HPE StoreFabric SN6010C 12-port Switch with an On Demand Port Activation License


C.

HPE 8/24 SAN Switch 16-port Switch with an 8-port Upgrade License


D.

HPE 8/24 SAN Switch 16-port Switch


Expert Solution
Questions # 12:

Which statement is true regarding configuring memory in an HPE ProLiant server?

Options:

A.

LRDIMMS in 64 GB and 128 GB can be mixed.


B.

RDIMM and LRDIMMs can be mixed in one system.


C.

Different capability DIMMs of the same speed can be mixed.


D.

The first CPU memory channel must be fully populated before the second.


Expert Solution
Questions # 13:

Why is RAID 6 the best option for a large RAID set for archive storage on large-capacity drives?

Options:

A.

to reduce risk during volume rebuild


B.

to increase write performance on the volume


C.

to maximize capacity of the volume


D.

to reduce drive wear


Expert Solution
Questions # 14:

A customer requires a high level of network bandwidth and reliability. You are installing a pair of HPE switches that can provide redundancy with multiple connections between them for high availability and faster throughput.

Which technology should you configure on the switches to enable the capability the customer requires?

Options:

A.

Rapid Spanning Tree Protocol (RSTP)


B.

Virtual Extensible Local Area Network (VxLAN)


C.

Multichassis Link Aggregation (MLAG)


D.

Multiple Spanning Tree Protocol (MSTP)


Expert Solution
Questions # 15:

You are designing a solution to run a Citrix XenDesktop workload.

Which HPE planning and designing resource contains a detailed example of this type of solution, including a list of all the hardware and software components?

Options:

A.

Sales Builder for Windows


B.

Product Bulletin


C.

Smart Selling Tool


D.

Reference Architecture


Expert Solution
Questions # 16:

A customer reports that their new iSCSI MSA 2052 has failed. You find that the MSA is up and running, but the servers cannot mount their LUNs.

Which troubleshooting steps should you prioritize? (Choose two.)

Options:

A.

Use Smart Storage Administrator (SSA) to view the STATS report on the MSA


B.

Use NIC teaming utility to validate the iSCSI initiator configuration


C.

Use remote console to check the switch port configuration


D.

Use remote console to validate the WWNs on the MSA


E.

Use remote console to ensure correct MSA port configuration


Expert Solution
Questions # 17:

you are designing a system for a customer that runs an OLTP application. The customer has SAN based storage. They need to accelerate application performance.

Which HPE ProLiant Gen10 feature set will address this customer’s needs?

Options:

A.

intelligent system tuning


B.

intelligent provisioning


C.

CNSA suite


D.

scalable persistent memory


Expert Solution
Questions # 18:

A customer needs to know if the storage solution you proposed contains components that are compatible with existing products currently in the data center.

Which HPE resource should you use to provide this information?

Options:

A.

Storage Size


B.

One Config Advance (OCA)


C.

One Config Simple (OCS)


D.

Single Point of Connectivity Knowledge (SPOCK)


Expert Solution
Questions # 19:

You are troubleshooting a POST error on a HPE ProLiant rack-mount server. HPE support has directed you to test a minimum hardware configuration.

Which components should you remove? (Choose two.)

Options:

A.

CMOS battery


B.

all cooling fans


C.

all expansion boards


D.

all external storage media


E.

redundant processors


Expert Solution
Questions # 20:

What can you do when installing an HPE switch to provide protection from electrostatic discharge?

Options:

A.

Install the switch in a rack with rubber insulators.


B.

Use a power surge protector.


C.

Load balance the power supplies.


D.

Connect the switch grounding cable correctly.


Expert Solution
Viewing page 2 out of 9 pages
Viewing questions 11-20 out of questions