Pass the Exin EPI Data Centre CDCS Questions and answers with CertsForce

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

The air intake of the mission-critical server at the top of the rack is measuring 25 °C/77 °F.

Is this acceptable?

Options:

A.

Yes, this is allowed according to the standards and guidelines


B.

As long as it does not exceed the average server room temperature of 38 °C/100 °F


C.

Depends on the ANSI/TIA-942 Rating the data center needs to comply with


D.

No, the temperature needs to be 20 °C/68 °F


Questions # 2:

In which stage of the data center life cycle does commissioning take place?

Options:

A.

Retire


B.

Operate/optimize


C.

Implement


D.

Design


Questions # 3:

A 5kW (power consumption) server keeps crashing with the message 'temperature too high'.

The intake temperature is measured at 25 °C/77 °F and a relative humidity (RH) level of 50%.

The exhaust temperature is 29 °C/84 °F and 45% RH.

The raised floor is providing an adequate amount of CFM/CMH at a reasonable velocity.

The pressure under the raised floor is approximately 25 Pa/0.1 inch H₂O.

Analyze the situation and indicate what the most likely cause is for this server to crash.

Options:

A.

Dust inside the server causing issues with convection-based heat transfer


B.

The exhaust temperature is exceeding the ASHRAE recommended values


C.

The raised floor pressure is too low and/or the raised floor tile % opening is not adequate


D.

No cause could be determined as the CFM/CMH of the air conditioning equipment is not stated


Questions # 4:

You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.

Which location for the temperature/humidity measurement should you recommend for the audit?

Options:

A.

At the back/rear of the server at 50 mm/2 inch


B.

At 1.5 meters/5 feet above the floor in the middle of the cold aisle


C.

At the front/intake of the server at 50 mm/2 inch


D.

At 1.5 meters/5 feet above the floor in the middle of the hot aisle


Questions # 5:

The temperature in the computer room is being increased from 18°C/64°F to 27°C/81°F.

What is the impact, if any, on the amount of gas required to suppress a fire assuming the gas is a Halocarbon?

Options:

A.

The amount of gas required will be higher


B.

The amount of gas required will not change


C.

The amount of gas required will be lower


D.

The change to the amount of gas cannot be determined without knowing the change in humidity as well


Questions # 6:

A computer room needs to be fitted out with a gas-based fire suppression system. The computer room will be a high-density data center with about 30% of the racks being closed circuit cooling blade-center racks.

Should the supplier of the fire suppression system be informed on the design of the racks?

Options:

A.

No, cooling and design of racks have no influence on the fire suppression system design.


B.

Only when the rack height obstructs a potential fire suppression release point.


C.

Yes, the design of the racks has an influence on the fire suppression system design.


D.

Only when the racks might block access to the fire panel.


Questions # 7:

A data center scores Rated-3 in mechanical, Rated-4 in electrical, and Rated-2 in architectural.

What is the overall Rating of this data center when the Rating is based on the ANSI/TIA-942?

Options:

A.

Rated-2 since that is the lowest rating received


B.

Rated-4 since that is the highest rating received


C.

Rated-4 since electrical is more important than mechanical and architectural


D.

Depends on the Rating scored in telecommunications


Questions # 8:

The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.

What action, if any, should you recommend for the computer room?

Options:

A.

Maintain the current wet pipe system.


B.

Replace the wet pipe system with a deluge system.


C.

Replace the wet pipe system with a dry pipe system.


D.

Replace the wet pipe system with a pre-action system.


Questions # 9:

What is the minimum requirement for the power feeds to the building for a Rated-3 data center based on the ANSI/TIA-942 standard?

Options:

A.

Two feeds coming from two different substations, one power company is not acceptable


B.

Two feeds coming from two different substations, one power company is acceptable


C.

Two feeds entering the data center building from one substation


D.

One feed from one substation split over two separated distribution boards in separate rooms


Questions # 10:

An MCB needs to be installed in the PDU of an air-conditioner unit.

Which breaking curve should you select?

Options:

A.

D-Curve


B.

C-Curve


C.

B-Curve


D.

A-Curve


Viewing page 1 out of 2 pages