Questions # 11:

What is the rack size of an F600 node?

Options:

A.

3U


B.

2U


C.

1U


D.

4U


Expert Solution
Questions # 12:

What accurately describes the InfiniBand cable support?

Options:

A.

Supports QSFP to QSFP cabling only


B.

Supports QSFP to QSFP cabling or QSFP to CX4 cabling


C.

Supports QSFP to CX4 cabling only


D.

Supports front-end customer external traffic


Expert Solution
Questions # 13:

What is a consideration when reimaging a Dell PowerScale node?

Options:

A.

Perform on a node mat is not a member of a cluster.


B.

Reimaging does not erase the data and is faster.


C.

Perform on a node that Is a member of a cluster.


D.

Use the rolling reimage update to retain the current OneFS version.


Expert Solution
Questions # 14:

An engineer wants to create a 4-node cluster after rack and stack.

What port must they use to start the installation?

Options:

A.

COM


B.

FE


C.

BE


D.

iDRAC


Expert Solution
Questions # 15:

Exhibit.

Question # 15

A platform engineer has connected power cables to a Dell PowerScale Gen6 node.

What does the status indicator indicate?

Options:

A.

Not functioning


B.

Cold and redundant


C.

Mismatch of voltage or component firmware


D.

On and healthy


Expert Solution
Questions # 16:

What is the required minimum number of PowerScale P100 and Bl 00 Accelerator nodes to add to a PowerScale cluster?

Options:

A.

2


B.

4


C.

1


D.

3


Expert Solution
Questions # 17:

A platform engineer is following the drive replacement procedure for a Dell EMC PowerScale Gen 6 node. One of the steps is the removal of the sled containing the target drive.

What is the maximum time a sled can be removed from its slot before all drives in that sled are SmartFailed automatically?

Options:

A.

10 minutes


B.

15 minutes


C.

20 minutes


D.

50 minutes


Expert Solution
Questions # 18:

An engineer replaced a failed node in a PowerScale H500 due to hardware issues. They must verity that the replacement node is functioning correctly.

What is a crucial step when replacing the failed node in the cluster?

Options:

A.

Run a diagnostic test on the replacement node.


B.

Confirm that the replacement node inherits the old serial number from the cluster.


C.

Verify the size of the storage capacity of the replacement node.


D.

Power on the replacement node and ensure it connects to the network without any problems.


Expert Solution
Questions # 19:

An existing PowerScale cluster consists of four A300 and three F600 nodes.

What is the minimum number of nodes an engineer can add to expand both node pools?

Options:

A.

txA300 2xF600


B.

2xA300 2xF600


C.

3xF600 4xA300


D.

2xA300 1x F600


Expert Solution
Questions # 20:

Windows clients cannot connect using the fully qualified domain name when testing the connectivity of a newly created cluster. What connection test identifies the problem?

Options:

A.

DNS


B.

NFS Mount


C.

Mapping a Windows drive


D.

WebUI using IP address


Expert Solution
Viewing page 2 out of 3 pages