What is the rack size of an F600 node?
What accurately describes the InfiniBand cable support?
What is a consideration when reimaging a Dell PowerScale node?
An engineer wants to create a 4-node cluster after rack and stack.
What port must they use to start the installation?
Exhibit.
A platform engineer has connected power cables to a Dell PowerScale Gen6 node.
What does the status indicator indicate?
What is the required minimum number of PowerScale P100 and Bl 00 Accelerator nodes to add to a PowerScale cluster?
A platform engineer is following the drive replacement procedure for a Dell EMC PowerScale Gen 6 node. One of the steps is the removal of the sled containing the target drive.
What is the maximum time a sled can be removed from its slot before all drives in that sled are SmartFailed automatically?
An engineer replaced a failed node in a PowerScale H500 due to hardware issues. They must verity that the replacement node is functioning correctly.
What is a crucial step when replacing the failed node in the cluster?
An existing PowerScale cluster consists of four A300 and three F600 nodes.
What is the minimum number of nodes an engineer can add to expand both node pools?
Windows clients cannot connect using the fully qualified domain name when testing the connectivity of a newly created cluster. What connection test identifies the problem?