Question #: 24
Topic #: 3

Which of the following statement(s) is/are true with respect to Change in Scrum projects?

I. The Scrum Master suggests changes in consultation with the Scrum Team.

II. The Scrum Master can recommend changes based on Retrospect Sprint Meetings.

III. Changes that are beyond the tolerance level of the Product Owner may need the assistance of the Scrum Master working with the Product Owner.

IV. The Scrum Master finalizes the formal Change Requests along with the Scrum Team.


A.

Only IV


B.

III and IV


C.

I and II


D.

Only I