FlashArray-Implementation-Specialist Exam Topic 7 Question 61 Discussion:
Question #: 61
Topic #: 7

An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.

What is a supported method to proceed with the planned capacity migration?


A.

Add the new datapack into slots CH0.BAY24 - CH0.BAY28 and start the EVAC of the drives in slots 0-9. Install the remaining drives after the EVAC completes.


B.

Install a swing shelf, add the new data pack to the swing shelf, and evacuate the old 22TB (10 x 2.2TB) pack.


C.

Evacuate the drives from slots 0-9 into remaining capacity, then install the new data pack into those slots.


D.

Remove the 22TB data pack instantly and rebuild the missing data onto the new 91TB drives from parity.