NCP-BC-7.5 Exam Topic 3 Question 29 Discussion:
Question #: 29
Topic #: 3

A financial institution is designing a disaster recovery solution for a business-critical application that requires a zero recovery point objective (RPO). The infrastructure team decides to implement Nutanix Metro Availability between two physical data centers (DC-Alpha and DC-Beta) interconnected by a dedicated dark fiber. What is the maximum possible network latency on this link for this configuration to function correctly?


A.

5 ms


B.

10 ms


C.

20 ms


D.

100 ms