Nokia NRS II Composite Exam 4A0-C01 Question # 72 Topic 8 Discussion

Nokia NRS II Composite Exam 4A0-C01 Question # 72 Topic 8 Discussion

4A0-C01 Exam Topic 8 Question 72 Discussion:
Question #: 72
Topic #: 8

Click the exhibit.

4A0-C01 Question 72

E-pipe 100 is using an SDP with an LSP that uses the path shown (PE1-PE2-PE3-PE4). Based on the OAM command output, which of the following is FALSE?


A.

The E-pipe can support a maximum MTU size of 1578.


B.

The ports of the link PE2-PE3 have an MTU of 1578.


C.

An svc-ping of the E-pipe will succeed.


D.

If the step size was 2, the maximum response size would be the same.