Question #: 28
Topic #: 3

A customer wants to replace their ONTAP cluster CN1610 switches with Cisco Nexus 3132Q-V switches. They want to perform a non-disruptive upgrade.

NS0-185 Question 28

Referring to the exhibit, which cable will be required to non-disruptively migrate to the new switches?


A.

a 10GbE SFP+ to SFP+ cable


B.

a 100GbE QSFP28+ to 4x25GbE SFP28+ cable


C.

a 40GbE QSFP+ to QSFP+ cable


D.

a 40GbE QSFP+ to 4x10GbE SFP+ cable