To identify the discrepancy between the drawings and the Room Finish Schedule for Room 101, compare what’s shown in the restroom elevation and plan versus the listed finishes.
Step-by-step comparison:
Room 101 (Women’s Restroom) is shown with:
Wall finish: Clearly shows tile (CT) on the lower half of the walls in the elevation.
But in the finish schedule, Room 101 has “PT” (paint) listed under wall finish.
✅ Therefore, the error is in the wall finish cell for Room 101, which should show CT (ceramic tile), not PT (paint).