NABCEP PV Installation Professional (PVIP) Board Certification PVIP Question # 29 Topic 3 Discussion

NABCEP PV Installation Professional (PVIP) Board Certification PVIP Question # 29 Topic 3 Discussion

PVIP Exam Topic 3 Question 29 Discussion:
Question #: 29
Topic #: 3

A PV system equipped with rapid shutdown requires a label stating ‘’RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM’’.

Which is the BEST description of where this label is required?


A.

On or within 3 ft. of the ac disconnect


B.

On or within 3 ft. of the ac disconnect


C.

On or within 3 ft. of the ac disconnect


D.

On or within 3 ft. of the ac disconnect


Get Premium PVIP Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.