Question #: 1
Topic #: 1

Test Management

You are performing a quality risk analysis for a CSCI (Computer Software Configuration Item) used to implement a CBIT (Continuous Built-In Test) module of a safety-critical system.

During the quality risk analysis you are trying to identify the ways in which failures of the CBIT module can occur, for each of them trying to determine the potential causes and likely effects, and the risk level (calculated as the product of three factors: severity, occurrence and detection).

Which of the following risk analysis techniques are you working with?

Number of correct responses: 1

K21 credit


A.

A lightweight product risk analysis technique


B.

Failure Mode and Effect Analysis


C.

Wide Band Delphi


D.

Cost of Exposure