93-Tall-Mass-Timber-Buildings Exam Topic 1 Question 7 Discussion:
Question #: 7
Topic #: 1

Each of the following is true for special inspection of mass timber construction except:


A.

continuous special inspection is required for bolted connections.


B.

periodic special inspection is required for concealed connections.


C.

periodic special inspection is required for the erection of mass timber construction.


D.

periodic special inspection is required to verify use of pre-drilled holes for threaded fasteners where required.