Exact Extract — Adaptation to SQA Operation Standard Process (PDF page 252, training slide 7)
Obtain project information. Obtain project information and identify quality risks.
Develop quality plans. Analyze the key items of the project and develop the quality management plan.
Check qualifications. Check whether the certification of the delivery partner company and the special operation qualification certificates of the installation personnel are within the validity period.
Conduct technical and safety disclosure. Participate in technical and safety disclosure, and supervise the supervision engineer to complete technical and safety disclosure to construction personnel, project team leader, customer/EPC and other related personnel before construction entry.
Technical Deep Dive:
The construction preparation phase establishes the operational, technical, and quality assurance conditions necessary for controlled project execution.
Option A is correct because all four activities belong to the preparation stage in Huawei ' s SQA operation standard process.
Preparing for entry involves obtaining project information, understanding the delivery scope, identifying site conditions, and examining potential quality and safety risks.
Quality planning establishes project-specific objectives, critical control points, inspection requirements, and responsibilities. The SQA coordinates relevant business departments to identify risks and implement preventive measures.
Qualification verification ensures that service partners, installation engineers, and personnel conducting specialized operations possess the required valid certifications.
Technical and safety disclosure ensures that construction personnel and project stakeholders understand equipment installation requirements, operating procedures, safety precautions, and preventive measures before construction begins.
The supervision engineer is responsible for conducting the required disclosure, while the SQA supervises its completion and checks the corresponding documentation.
These activities reduce the probability of construction defects, unauthorized work, safety incidents, and subsequent project delays.
The preparation phase is therefore not limited to administrative arrangements. It establishes the controls required for quality assurance throughout subsequent construction activities.
Final verification: A.
Submit