Question #: 23
Topic #: 3

In iMaster NCE-Campus V300R022C00, the function description of the distributed switch (remote module) scenario is incorrect ()


A.

O&M capability: support restart operations on distributed switches: support reporting alarms for failed upgrade of distributed switches. Control capability: Configurations can be directly delivered to distributed switches (remote modules).


B.

Control capability: support direct configuration delivery to distributed switches (remote modules).


C.

Management capability: You can view the information of the distributed switch based on the central switch, including the ESN, model, online status, interface directly connected to the central switch, and the port list information of the distributed switch itself.


D.

Monitoring capability: You can view the memory usage, storage space usage, and temperature of distributed switches, as well as the running status, rate, flow rate, packet statistics, and bandwidth utilization of distributed switch ports.