Huawei HCSP-Presales-Campus Network Planning and Design V1.0 H19-424_V1.0 Question # 22 Topic 3 Discussion

Huawei HCSP-Presales-Campus Network Planning and Design V1.0 H19-424_V1.0 Question # 22 Topic 3 Discussion

H19-424_V1.0 Exam Topic 3 Question 22 Discussion:
Question #: 22
Topic #: 3

The description of the main controller of the CloudEngine S8700 switch is incorrect.


A.

04, 06, and 10 main control boards cannot be shared


B.

The main controller does not provide a business port


C.

The main control and switching are integrated, and the centralized architecture has a lower switching delay


D.

1:1 primary/standby in the frame, primary/standby switchover and packet loss < 5ms


Get Premium H19-424_V1.0 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.