What does Recovery Time Objective (RTO) indicate?
The maximum allowable downtime after which the consequences of a disruption become unacceptable
The total duration of time within which a business process must be restored after a disaster to avoid unacceptable consequences
The time it takes for recovery operations to be completed after a notification
The time to repair or replace damaged data infrastructure components
Submit