EGMP2201 Exam Topic 2 Question 19 Discussion:
Question #: 19
Topic #: 2

An organization uses a two-way replica to share edits for a polygon feature class with a field office. After months of synchronizing edits, a schema change takes place using the following workflow;

• A new field called a legal_area is added to a polygon feature class in the parent geodatabase

• An editor uses the Calculate Geometry tool to calculate legal_area for each polygon

• The child geodatabase does not have the legal_area field in the polygon feature class

• The parent geodatabase synchronizes the replica to the child geodatabase

What happens during synchronization?


A.

An error message occurs


B.

The synchronization adds the missing field


C.

The synchronization succeeds


Get Premium EGMP2201 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.