Question #: 7
Topic #: 1

Refer to the exhibit.

DES-1111 Question 7

An SRDF/A solution with BCSD is designed and the results are shown in the exhibit. A customer requirement was a five-minute RPO. In the exhibit shown, the RPO is above the customer requirement.

How can the five-minute RPO requirement be met?


A.

Increase DSE capacity


B.

Provide more bandwidth


C.

Increase number of RA ports


D.

Increase cycle time