Exhibit:
In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.
Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
Pre-cable each boat slip during construction.
For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.