A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?


A.

Clearances will still be adequate with the added equipment.


B.

That all of the poles on the path are at least Class 3.


C.

Sufficient space exists to install additional guying if required.


D.

Utility coordination with public utilities verifies minimum inductive interference.