BICSI Registered Communications Distribution Designer – RCDDv14 RCDDv14 Question # 31 Topic 4 Discussion

BICSI Registered Communications Distribution Designer – RCDDv14 RCDDv14 Question # 31 Topic 4 Discussion

RCDDv14 Exam Topic 4 Question 31 Discussion:
Question #: 31
Topic #: 4

Exhibit:

RCDDv14 Question 31

In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?


A.

Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.


B.

Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.


C.

Pre-cable each boat slip during construction.


D.

For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.


Get Premium RCDDv14 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.