In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
A.
Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
B.
Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install service drop to each boat slip.
C.
Pre-cable each boat slip during construction.
D.
For security, each install should be terminated in the patch panel/cross-connect at the dockmaster or marina office.
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit