There is a recommended order to powering up the Avaya IP Office™ 500V2.

Why is the first step to power up the expansion modules before powering up the control unit?


A.

It is easier to start with the expansion unit at the top and then work your way down.


B.

All expansion units need to be powered for the control unit to discover them.


C.

The configuration files from the expansion units SD cards need to be loaded before the control unit is started.


D.

The expansion units take longer to power up.