Summer Certification Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

Autodesk Certified Professional in BIM Management for Building Design BIM_MGT_101 Question # 4 Topic 1 Discussion

Autodesk Certified Professional in BIM Management for Building Design BIM_MGT_101 Question # 4 Topic 1 Discussion

BIM_MGT_101 Exam Topic 1 Question 4 Discussion:
Question #: 4
Topic #: 1

A project model, which includes multidisciplinary and DWG links, has been exhibiting problematic behavior. It takes a long time to save and synchronize, or crashes unexpectedly. Even though there are no imported DWGs, a scan of the model reveals a large number of IMPORT line patterns that typically come from DWG imports and links and are a possible cause of model-performance loss.

To remedy and prevent a repetition of this situation, the BIM manager is attempting to mentor the team on best practices for preparing DWGs for linking to a Revit model.

Which workflow steps will optimize the DWG files and prevent inefficiencies and loss of productive time due to repeated poor DWG-linking practices?


A.

Delete all XREFs; change all fonts to Arial.


B.

Delete all text; explode all geometry.


C.

PROXYGRAPHICS=0, PURGE, AUDIT, OVERKILL.


D.

PROXYGRAPHICS=1, PURGE ALL, AUDIT, OVERKILL.


Get Premium BIM_MGT_101 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.