Question #: 18
Topic #: 2
A company assembles kits of hand tools after receipt of the order from distributors and uses two-level master scheduling. The appropriate levels of detail for the forecasts that are input to master scheduling would be total number of kits and:
A company that uses two-level master scheduling has a master production schedule (MPS) for the end items (kits) and a final assembly schedule (FAS) for the components (tools). The forecasts that are input to master scheduling should reflect the total number of kits and the specific kit configurations, as these determine the demand for the components. The other options are not relevant for master scheduling, as they do not reflect the end item demand or the bill of materials structure. References: EXAM CONTENT MANUAL PREVIEW, page 10, section 4.1.2. Manufacturing Planning and Control for Supply Chain Management: The CPIM Reference, Second Edition, page 163, section 6.2.
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit