A facility has the thermal cooling load profile shown in the table below. The utility rate traffic has an no-peak time-of-use period that begins at 10:00 a.m ends at 7:00 p.m. What chiller capacity (output) is required for a load-leveling operating strategy?
[Question from the previous image, which was about chiller capacity for load leveling, but the table was missing]