Which of the following are critical factors that must be considered when evaluating warehouse or storage locations?
The cost of the proposed location
Who owns the storage location or warehouse
Access to transport networks
The number of windows in the building
In a fast-moving consumer goods (FMCG) organisation, a site has separate packaging areas for incoming and outgoing food. The incoming packages must be opened and unpacked before any of the food ingredients can be sorted for distribution. Production line workers run the risk of severe hand strains and knife-related injuries if the box cutting is done manually. Which of the following can eliminate any potential risk of injury to the production line workers while having
the ability to Increase the throughput?
Which of the following is an acquisition cost under the concept of the total cost of ownership?
A company does not have enough space to hold inventory to satisfy an external foreign market. Therefore, the board of directors has decided that the company would buy stock in bulk and pay a fee for storage to a third-party warehouse provider local to the foreign market. This would allow the company to focus on other aspects of the business. The stock will be called off as and when required. Which of the following strategies is being pursued by this company?
Which of the following are benefits of enterprise resource planning (ERP)?
Select TWO that apply.
Which of the following factors will need to be taken in to account when deciding on the location of a warehouse?
Which of the following correctly describes the triple bottom line?
Which ONE of the following correctly differentiates between obsolescent and redundant stock?
A procurement manager is sourcing some high-value equipment for their organisation. What are the elements comprising whole-life costing that they need to consider?
SpeedyCar GmbH is a vehicle manufacturer that is launching a new electric vehicle onto the market, replacing a previous diesel vehicle. There is a lot of equipment in the manufacturing site to be changed, some new machinery to replace older machinery, and some production equipment to decommission. The costs of decommissioning would include which of the following?