Pass the CIDQ Interior Design Certification IDFX Questions and answers with CertsForce

Viewing page 3 out of 4 pages
Viewing questions 21-30 out of questions
Questions # 21:

What is the BEST method for a designer to communicate benchmarking research outcomes to a client?

Options:

A.

A written summary document


B.

A table of code considerations


C.

A visual display of statistics and data


D.

A complete study with parti diagrams


Expert Solution
Questions # 22:

A designer was not able to be present during the time of a mock-up walk-through. What can the designer provide to the users to capture their comments and concerns?

Options:

A.

Case study


B.

Questionnaire


C.

Summary report


D.

Casual observation


Expert Solution
Questions # 23:

What millwork standard would provide the highest quality?

Options:

A.

Modular casework in a C select grade


B.

Finish carpentry in a Prime VG finish quality


C.

Finish carpentry in Superior VG finish quality


D.

Architectural woodwork in a B or better grade


Expert Solution
Questions # 24:

A design firm submits a bid for a healthcare project noting that they specialize in healthcare design, when they have only completed education projects that contain one small nurse room per project. This is an example of violating the

Options:

A.

Code of ethics


B.

RFP guidelines


C.

Permitting requirements


D.

Health and safety guidelines


Expert Solution
Questions # 25:

In the northern hemisphere, which window orientation would maximize passive solar energy without the use of fans, pumps, or complex controllers?

Options:

A.

East


B.

West


C.

North


D.

South


Expert Solution
Questions # 26:

What is required on a window schedule?

Options:

A.

Finish and glazing dimensions


B.

Model number and style of trim


C.

Unit size and location on elevations


D.

Type of glass and rough opening dimensions


Expert Solution
Questions # 27:

What is the best way for a designer to convey the locations of flooring transitions between materials?

Options:

A.

Provide a detailed finish schedule


B.

Reference the floor covering schedule


C.

Refer to the finish legend and specifications


D.

Include a finish plan in the construction documents


Expert Solution
Questions # 28:

A block plan differs from a bubble diagram in that it considers

Options:

A.

Dead-end corridors and wayfinding


B.

The building envelope and is drawn to scale


C.

Functional adjacencies and space planning zones


D.

Major circulation patterns and toilet fixture counts


Expert Solution
Questions # 29:

Where would an interior designer specify electrostatic dissipative flooring and wall materials?

Options:

A.

Server room


B.

Exercise room


C.

Reception area


D.

Conference center


Expert Solution
Questions # 30:

If a client requires a full-scale representation of a proposed workstation, what would be requested?

Options:

A.

Mock-up


B.

Shop drawing


C.

Finish sample


D.

Specifications


Expert Solution
Viewing page 3 out of 4 pages
Viewing questions 21-30 out of questions