Questions # 41:

Under which of the following product requirements would the amount of work completed by a software system over a period of time be classified?

Options:

A.

Interface


B.

Attribute


C.

Functional


D.

Performance


Expert Solution
Questions # 42:

Which of the following is an example of a poorly defined project milestone?

Options:

A.

Program specification completed


B.

Test plan approved by customer


C.

Coding 50% completed


D.

Program documentation approved


Expert Solution
Questions # 43:

Which of the following techniques will improve the accuracy of data collection the most?

Options:

A.

Automating the data evaluation process


B.

Training staff m the data gathering process


C.

Defining the data gathering time frame


D.

Analyzing post-project data


Expert Solution
Questions # 44:

Under design control, the design phase should proceed until

Options:

A.

system elements of the smallest structure are defined and specified


B.

the developers understand the level of work expected


C.

the allocated time for system design has been reached


D.

every possible design variation has been explored


Expert Solution
Questions # 45:

Which of the following activities can be performed during the requirements phase?

Options:

A.

Data normalization


B.

Acceptance test planning


C.

Functional testing


D.

Reliability modeling


Expert Solution
Questions # 46:

When brainstorming is used to generate ideas, the most immediate result will be

Options:

A.

an unrestricted list of items


B.

a prioritized list of items


C.

a categorized list of items


D.

a problem solution


Expert Solution
Questions # 47:

When performing top-down testing, which of the following tools is used in place of a module that is not yet developed?

Options:

A.

Stubs


B.

Driver


C.

Hamess


D.

Test script


Expert Solution
Questions # 48:

Which of the following software security requirements objectives is met by limiting access to the system through passwords?

Options:

A.

Supplying an audit trail


B.

Preserving data integrity


C.

Maintaining access control


D.

Providing backup and/or recovery


Expert Solution
Questions # 49:

Which of the following scenarios warrants the adoption of software configuration management tools?

Options:

A.

A project with short timelines to completion


B.

A simple project with few files and little complexity


C.

A complex project with multiple modifications and frequent change requests


D.

A project without security requirements or specified control over files and changes


Expert Solution
Questions # 50:

Which of the following statements is true about a walk-through?

Options:

A.

Its objective is to correct defects


B.

It is facilitated by a manager


C.

The presenter is the developer.


D.

formal database is required.


Expert Solution