The following groups may provide information required for the Process Knowledge Management element (select all that apply)
A line is provided for adding a chemical to a reactor to quench the reaction. The line has an automatic valve which is designed to open when reactor temperature exceeds the High-High limit. Which of the items are key parts of the ITPM (Inspection, Testing, and Preventive Maintenance) requirements for the valve? (Select all that apply)
Which of the following criteria would justify not performing a periodic review of operating procedures?
All three flammable gas detection alarms have indicated in the control room the presence of a flammable vapor in the containment area below a horizontal butane storage tank. The correct operator response to this emergency would include (select all that apply):
A vessel has a rupture disc and pressure relief valve in series to protect against high pressure in the vessel. There is a pressure gauge on the pipe between the rupture disc and the relief valve. The gauge normally reads zero. As part of regular maintenance inspections, these pressure gauges are supposed to be routinely checked.

Today, a pressure of nearly 50 psig (~3.5 barg) was observed by an operator. There is a significant hazard now. Identify the hazard and discuss which elements of Risk-Based Process Safety could have been involved in the development of this situation.
Asset Integrity inspection/test methods for tubes in shell and tube heat exchangers include (select all that apply):
Secondary dust explosion consequences are often related to poor housekeeping, true or false?
Who is involved in Management Review at an operating facility? (select all that apply)
Sources of information on previous incidents to be reviewed during a Process Hazard Analysis can include: (select all that apply)
What are the main objectives for conducting a Process Safety Management audit? (Select all that apply)