Question #: 5
Topic #: 1

A vessel has a rupture disc and pressure relief valve in series to protect against high pressure in the vessel. There is a pressure gauge on the pipe between the rupture disc and the relief valve. The gauge normally reads zero. As part of regular maintenance inspections, these pressure gauges are supposed to be routinely checked.

CCPSC Question 5

Today, a pressure of nearly 50 psig (~3.5 barg) was observed by an operator. There is a significant hazard now. Identify the hazard and discuss which elements of Risk-Based Process Safety could have been involved in the development of this situation.


A.

No hazard exists because the relief valve will always protect the system


B.

The rupture disc may have failed or leaked, compromising the relief system and creating overpressure risk


C.

The pressure gauge is faulty and can be ignored


D.

The system is operating normally under transient conditions