Pass the VMware VMware Certified Specialist - Cloud Foundation 2023 5V0-31.22 Questions and answers with CertsForce

Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
Questions # 11:

An administrator has registered an external identity source in a consolidated architecture and would like to make sure that any subsequent workload domains can be accessed using the same identity sources.

How can this goal be achieved with VMware Cloud Foundation?

Options:

A.

By configuring IWA as an identity source


B.

By configuring LDAPS as an identity source


C.

By keeping the pre-configured defaults


D.

By replicating vSphere SSO configuration


Questions # 12:

An administrator needs to upgrade the current VMware Cloud Foundation (VCF) environment from version 4.1 to 4.3, knowing that the environment has direct access to the internet.

Which steps should be performed to download the online bundles?

Options:

A.

1 vSphere Lifecycle Manager checks depot.vmware.com.

2. The administrator accesses vSphere Lifecycle Manager.

3. The administrator downloads the bundles from vSphere Lifecycle Manager.


B.

1 SDDC Manager checks depot.vmware com.

2. The administrator accesses vSphere Lifecycle Manager

3. The administrator downloads the bundles from vSphere Lifecycle Manager


C.

1. vSphere Lifecycle Manager checks depot vmware.com

2. The administrator accesses SDDC Manager.

3. The administrator downloads the bundles from SDDC Manager.


D.

1. SDDC Manager checks depot.vmware com.

2. The administrator accesses SDDC Manager.

3. The administrator downloads the bundles from SDDC Manager.


Questions # 13:

A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:

• Provide scalable high-performance networking with layer-3 termination at top-of-rack

• Protect workloads from switch/NIC/rack failure

• Provide isolation for DMZ workloads

• Provide at-least 25Gbps dedicated bandwidth to backup traffic

• Easily accept workloads on traditional VLAN-backed networks

• Fully-supported by VMware

Which three design considerations meet all of these requirements? (Choose three.)

Options:

A.

Two-node Edge Cluster with ECMP


B.

Spine and Leaf network topology with layer-3 at Spine


C.

Stretched Clustering


D.

Spine and Leaf network topology with layer-3 at top of rack


E.

Two-node Edge Cluster with BFD


F.

Core Aggregation network topology


Questions # 14:

Which three options are valid use cases for multiple clusters in a workload domain? (Choose three.)

Options:

A.

Workload domain with multiple availability zones each containing clusters


B.

Workload domain with multiple clusters in one rack


C.

One cluster stretching two workload domains


D.

Two clusters forming one stretched workload domain


E.

One stretched cluster across two regions and two workload domains


F.

One cluster distributed across two racks and one workload domain


Questions # 15:

Which two configuration steps must a VMware Cloud Foundation administrator apply to achieve north/south connectivity while setting up an edge VM node for a workload domain from the SDDC Manager user interface? (Choose two.)

Options:

A.

ToR Switches VRFs


B.

OSPF Configuration


C.

BGP Configuration


D.

vSphere VDS Uplinks


E.

NSX VDS Uplinks


Questions # 16:

What is a valid way to replace the expiring evaluation Tanzu license for a vSphere with Tanzu cluster?

Options:

A.

1. Connect to the SDDC Manager.

2. In the navigation pane, click Solutions.

3. Find the cluster, click “Update Workload Management license”, and select the appropriate license.


B.

1. Connect to the SDDC Manager.

2. Go to Administration > Licensing.

3. Add the license key for vSphere with Tanzu.


C.

1. Connect to the vCenter Web Console.

2. Go to Menu > Home > Administration > Licenses

3. Click “Add New Licenses”, and enter the license key.


D.

1. Connect to the vCenter Web Console.

2. Go to “Hosts and Clusters”, and right click on the cluster that supports namespace creation.

3. Click “Assign license”, and select the appropriate license.


Questions # 17:

Which order of operations deletes a VI Workload Domain from a VMware Cloud Foundation environment?

Options:

A.

1. Migrate VMs.

2. Remove NSX Edge clusters.

3. Remove the Workload Domain.

4. Decommission hosts.

5. Delete the network pool.


B.

1. Migrate VMs.

2. Remove NSX Edge clusters.

3. Remove the Workload Domain.

4. Delete the network pool.

5. Decommission hosts.


C.

1. Migrate VMs.

2. Remove the Workload Domain.

3. Decommission hosts.

4. Delete the network pool.


D.

1. Migrate VMs.

2. Decommission hosts.

3. Remove the Workload Domain.

4. Delete the network pool.


Questions # 18:

A VMware administrator is tasked to upgrade a VMware Cloud Foundation (VCF) environment that is running on DellEMC PowerEdge servers.

During the ESXi software upgrade for the VI Workload Domain hosts, the administrator receives an error stating that the correct storage driver is not available, although the storage adapters are enabled in the BIOS.

Which action should the administrator take to fix this issue?

Options:

A.

Use the Dell EMC customized image for the ESXi build in the VCF bill of materials.


B.

Upgrade the storage adapter firmware to the latest version.


C.

Use the image for the ESXi build in the VCF bill of materials.


D.

Upgrade the BIOS firmware to the latest version.


Questions # 19:

A customer purchased six new HPE ProLiant DL380 Gen10 hosts and is interested in deploying a VCF infrastructure that will coexist with the current VMware on AWS cloud DR solution in a hybrid model.

The architect suggests the VCF architecture that will help the customer run the workloads while offering workload isolation.

Which VCF architecture was suggested for this customer?

Options:

A.

node management domain and 3-node VI workload domain in a VCF standard model, while leveraging resource pools


B.

3-node management domain and 3-node VI workload domain in a VCF standard model


C.

node management/workload domain in a VCF consolidated model, while leveraging resource pools


D.

node management/workload domain in a VCF consolidated model


Questions # 20:

A systems administrator has recently added newly-commissioned hosts in the the VI workload domain, and IP addresses are automatically configured to their associated network pool. The administrator reviews which storage options require only vMotion and NFS networks in the network pool.

Which two storage options have this requirement? (Choose two.)

Options:

A.

Wols on ISCSI


B.

NFS


C.

vSAN and NFS


D.

vVols on NFS


E.

vSAN


Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions