When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?
For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be
completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most
appropriate one to use?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
In which of the following ways can a campus project using a Group Approach comply with Water Efficiency
Prerequisite, Building-Level Water Metering?
Which of the following is required when documenting a LEED Pilot Credit?
Buildings account for what percentage of total energy use?
Which of the following prerequisites or credits has a minimum occupancy requirement?
Which of the following is a low impact development (LID) technique for rainwater management?