Pass the SAP SAP Certified Application Associate C_TS422_2022 Questions and answers with CertsForce

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

where does the system check master data selection settings during the creation of planned orders and production orders?

Note: There are 3 Correct answers to this question.

Options:

A.

in the bill of material (BOM)


B.

in the work centers


C.

in the MRP controller


D.

In the routing


E.

in the production version


Expert Solution
Questions # 12:

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Note: There are 3 correct answers to this question.

Options:

A.

Use stock transfer reservations for stock transfer.


B.

Use purchase orders for external procurement.


C.

Use quotations for internal and external procurement


D.

Use run schedule quantities for in-house production.


E.

Use purchasing costs for automated source prioritization.


Expert Solution
Questions # 13:

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

Note: There are 2 correct answers to this question.

Options:

A.

Use the Batch Information Cockpit.


B.

Use batch derivation.


C.

Use batch determination


D.

Use the batch where-used list.


Expert Solution
Questions # 14:

In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

Options:

A.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.


B.

MRP assigns the capacity requirements automatically after the last scheduled order on a work center.


C.

MRP creates the capacity requirements without checking the work center capacities.


D.

MRP creates the capacity requirements only if the work center has sufficient capacity.


Expert Solution
Questions # 15:

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Options:

A.

Planning with final assembly (40)


B.

Production by lot size (30)


C.

Planning at assembly level (70)


D.

Make-to-order production (20)


Expert Solution
Questions # 16:

Which business processes are affected by settings in the order-type-dependent parameters?

Note: There are 2 correct answers to this question.

Options:

A.

Check material availability.


B.

Schedule production orders.


C.

Define integration with cost accounting.


D.

Select master data.


Expert Solution
Questions # 17:

which actions does the system perform by default when you save a confirmation for a finished

product in repetitive manufacturing?

Note: There are 3 Correct answers to this question.

Options:

A.

Posting of production costs to the production cost collector


B.

posting of goods receipt for the product


C.

Reduction of associated capacity requirements


D.

Archiving of document for assembly scrap


E.

Material staging for next order in sequence


Expert Solution
Questions # 18:

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

Options:

A.

The planned order is converted to a production order.


B.

The planned order's component availability is checked.


C.

The planned order generates capacity requirements


D.

The planned order's components are copied to the picking list.


Expert Solution
Questions # 19:

What do you need to consider when working with material master numbering in SAP S/4HANA?

Note: There are 2 correct answers to this question.

Options:

A.

Material numbering is defined cross-client.


B.

Material numbering is defined at client level.


C.

The maximum material number length is 18 for external numbers and 18 for internalnumbers.


D.

The maximum material number length is 40 for external numbers and 18 for internal numbers


Expert Solution
Questions # 20:

During production order creation, several valid production versions are found. How does the system choose the production version?

Options:

A.

Lot size or material cost


B.

Validity period or sales order


C.

Planned order or material number


D.

Alphanumeric or quota arrangement


Expert Solution
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions