An SE needs to size a new project that requires offsite backup but not remote disaster recovery. The prospect requires an RTO of 48 hours, RPO of 4 hours, and the ability to restore from the past 5days of backups. The prospect's data change rate is 1%.
How should the SE configure Sizer for this scenario?
A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC.
What additional option should the SE recommend to avoid a POC?
An SE is building a solution for a federal goverment prospect that u???
Which two items are required to deliver a solution that meens the ??? encryption (choose two)
A prospective customer wants to build a private cloud in addition to provisioning workloads across multiple public cloud providers.
Presently, the staff lacks the time and skillset for on-premises infrastructure management.
Which two features should qualify this project as a Nutanix opportunity?
(choose two)
An SE is conducting a first call presentation with their Account Executive and a prospect. The prospect needs to build a private cloud but has been unable to implement the solution in-house, since using their traditional architecture would require integrating server, storage and networking solutions from six different vendors.
The cost and complexity of that approach is too high. Also their current infrastructure is not built for scalability or performance.
The prospect has considered upgrading their traditional server and SAN storage platforms but could not meet requirements for scale and performance using this approach.
In what order should the SE present the critical product and technology portions of the First Customer Presentation to the IT Director?
An SE builds a sizer scenario for a prospect's remote site running on an NX-1365S-G5.
Using only the sizer BOM. which two actions can be performed? (Choose two.)
A prospect's business is growing 100% year over year. The prospect is interested in Nutanix for their main datacenter due to the alility to scale quickly and easily. They have three remote sites that will be refreshed within the next year. Each site needs to replicate to their many datacenter. The SE proposes the Nutanix NX line, and the prospect asks to utilize the Xpress line.
For which reason is the Xpress line the wrong choice? (Choose two)
A prospect provides the following details for sizing active working set based on their existing server virtualization environment:
Full backup reports:
January: 10TB
February: 11TB
March: 12TB
April: 13TB
May: 14TB
Average Read/Write Ratio - 75/25
When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?
A customer is conceded that IT will not be able to take advantage of Nutanix's frequent feature releases due to the man hour requirements of maintaining compliance with industry regulatory controls.
Which item should the SE discuss at the next customer visit with IT?
Oracle HCL for Certified Joint Support with Nutanix has Oracle Linux and Oracle VM via iSCSI listed.
What Nutanix feature is used by this certified configuration?