You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.
You need to configure the bicycles’ production resource.
Which option should you use?
You need to create the production orders for standard model bicycles.
Which method should you use?
You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.
You need to report newly manufactured bicycles as finished products.
Which three options can you use? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to create production orders for the new summer limited-edition bicycles.
How should they be created? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.
Which object should you use?
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to configure the reservation methods prototype production order as planned by the engineering team.
How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to configure the production requirements of the controller.
What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.