You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You need to set up the configuration model to price the motorcycles correctly. What should you do?
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You need to create production orders for the new summer limited-edition bicycles.
How should they be created? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

You need to configure the reservation methods prototype production order as planned by the engineering team.
How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.