Pass the Huawei HCIE-5G Radio H35-582 Questions and answers with CertsForce

Viewing page 1 out of 4 pages
Viewing questions 1-10 out of questions
Questions # 1:

Which of the following are the development phases of C -V2X?

Options:

A.

GSM-V2X


B.

LTE-V2X


C.

5G=V2X


D.

UMTS-V2X


Questions # 2:

In addition to the technology of increasing the number of connections, what technical support is needed for the smart meter reading business? (single-choice question, 2 points)

Options:

A.

Rate boosting technology


B.

Reduced latency for family members


C.

Technology of increasing the number of connections


D.

Coverage Enhancement Techniques


Questions # 3:

Which of the following power grid businesses has the highest requirements on the number of terminals? (single-choice question, 2 points)

Options:

A.

Distributed distribution automation


B.

Precise load control


C.

Low-voltage electricity consumption information collection


D.

UAV power grid inspection


Questions # 4:

Which following 5G scenario specification is predominately completed in the 3GPP R15 version

Options:

A.

mMTC


B.

uRLLC


C.

eMBB .


D.

MBB


Questions # 5:

Under NSA networking, the smallest granularity of PDCP layer business offloading is user level.

Options:

A.

True


B.

False


Questions # 6:

Which of the following is a new service in the 5G era?

Options:

A.

SMS


B.

High-reliability and low-latency services


C.

Mobile internet


D.

N8-LoT


Questions # 7:

What was the first standard release of LTE? (single-choice question, 2 points)

Options:

A.

Relasee4


B.

Relasee7


C.

Relasee8


D.

Relasee10


Questions # 8:

Which of the following are pain points relating to PC gaming experience? _MC

Options:

A.

High software price


B.

Piracy


C.

No anywhere anytime access


D.

Low hardware investment


Questions # 9:

Which of following are the key of intelligent distributed power distribution automation on commination network?

Options:

A.

Millisecond-level ultra-low latency


B.

high isolation


C.

high reliability


D.

massive access form tens of millions of terminals


Questions # 10:

During the VR service test, in order to maximize the downlink peak value of the cell, which of the following measures can

be adopted?

Options:

A.

Ensure the downlink LOS environment


B.

Adjust the DMRS type of PDSCH to Type1


C.

Adjust the time slot ratio from 8:2 to 7:3


D.

Adjust the maximum number of downstream scheduled streams to 4 streams or higher


Viewing page 1 out of 4 pages
Viewing questions 1-10 out of questions