Questions # 1:

Every air distribution system has which two types of systems?

Options:

A.

Supply, Release


B.

Supply, Return (Selected)


C.

Supply, Reverse


D.

Maintenance, Regulation


Expert Solution
Questions # 2:

Which type of power can serve as a backup source in a data center, taking over when utility power is unavailable?

Options:

A.

Standby


B.

Passive


C.

Active


D.

Alternate


Expert Solution
Questions # 3:

Which type of circuit breaker uses an electromagnetic coil to trip the switch when the current exceeds safe limits?

Options:

A.

Thermal


B.

Magnetic (Selected)


C.

Pull


D.

Static


Expert Solution
Questions # 4:

Which is a systematic variation of the voltage waveform or a series of small, random voltage changes?

Options:

A.

Voltage fluctuation


B.

Voltage truncation


C.

Frequency variation


D.

Standby variation


Expert Solution
Questions # 5:

Which of the following measures the actual power consumed by the load equipment?

Options:

A.

Watts


B.

Amps


C.

Volts


D.

Amperes


Expert Solution
Questions # 6:

___________ measures the amount of electrical current flowing through a circuit during a specific time interval.

Options:

A.

Ohm


B.

Ampere


C.

Volts


D.

Watts


Expert Solution
Questions # 7:

Which mounted cooling system is typically used for small IT environments?

Options:

A.

Air Mounted System


B.

Chilled Mounted System


C.

Ceiling Mounted System (Selected)


D.

Floor Mounted System


Expert Solution
Questions # 8:

A typical data center load would consist of _____ (Choose 3)

Options:

A.

Cooling equipment


B.

Networking equipment


C.

Power generator


D.

Software


E.

Computers


Expert Solution
Questions # 9:

Which one of the following is a disadvantage of Water Cooled System?

Options:

A.

All components are located inside the CRAC


B.

Condenser water piping loops long distances


C.

Usage of the building's condenser water is less expensive than chilled water


D.

Introduces an additional source of liquid


Expert Solution
Questions # 10:

Which of the following processes requires direct current (DC) and cannot function with alternating current (AC)?

Options:

A.

Heating


B.

Lighting


C.

Turning a motor


D.

Electrolysis


Expert Solution